If VTAM® is allowed
to decide whether to reload the communication controller, one of the
following occurs:
- If the communication controller contains no program, VTAM loads the NCP into the communication controller.
- If VTAM decides that a
load is not necessary, VTAM issues a message to inform you, and it performs no disk-related
functions.
- If the communication controller already contains the NCP being
activated, you might be asked whether the existing NCP should be refreshed
with a new copy. If you specified AUTOSYN=NO on the PCCU definition
statement in the NCP definition, VTAM does not automatically resynchronize itself with the existing
NCP, but rather asks you whether resynchronization or reloading should
occur. Otherwise, VTAM resynchronizes
itself with the NCP without operator intervention and without reloading
the communication controller.
- If the communication controller contains an NCP other than the
one being activated, you might be asked whether the existing NCP should
be replaced. If you specified VFYLM=YES on the PCCU statement in the
NCP definition, you are asked to confirm that the communication controller
should be reloaded. Otherwise, VTAM proceeds with the reload without operator intervention.
- If the communication controller contains a program other than
an NCP (for example, an EP program in a channel-attached communication
controller), the NCP activation fails. During activation VTAM attempts channel contact, but when the
identification exchange fails, VTAM assumes that the communication controller might contain an EP program. VTAM then attempts to resynchronize
with the assumed NCP. Activation of the channel link station fails
when the resynchronization fails. This results in failure of the NCP
activation itself. Another VARY ACT command specifying LOAD=YES can
be entered to force loading of the NCP.