z/OS Communications Server: SNA Network Implementation Guide
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


Sample coding for an intermediate routing node link

z/OS Communications Server: SNA Network Implementation Guide
SC27-3672-01

The following sample illustrates how to code for an intermediate routing node link.

G6INN    GROUP ACTIVTO=120,                ACTIVATE TIMEOUT
               DIAL=NO,                    NONSWITCHED CONNECTION
               LNCTL=SDLC,                 SDLC LINK CONTROL
               REPLYTO=(10.0,15.0),        RETRY COUNTS
               TYPE=NCP,                   NCP LINK
               ⋮
               ISTATUS=ACTIVE              INITIAL VTAM STATUS
*
L51028   LINE  ADDRESS=(1028,FULL),        LINE ADDRESS
               SPEED=1474560,              LINK SPEED
               CLOCKNG=EXT,                EXTERNAL CLOCKING
               DUPLEX=FULL,                FULL DUPLEX OPERATION
               PAUSE=(1.0,1.0),            PRIMARY AND SECONDARY PAUSE
               SDLCST=(PRIM,SEC),          SDLCST PRIMARY/SECONDARY
               ⋮
               ISTATUS=ACTIVE              INITIAL VTAM STATUS
*
C51028A  PU    ANS=CONTINUE,               CONTINUE AFTER VTAM FAILURE
               PUTYPE=4,                   PHYSICAL UNIT TYPE = NCP
               TGN=8,                      TRANSMISSION GROUP NUMBER
               ⋮
               ISTATUS=ACTIVE              INITIAL VTAM STATUS

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014