Step 1: Creating the job

Create an example job that includes one Unstructured Data stage and one Sequential File stage.

Procedure

  1. Start the IBM® InfoSphere® DataStage® and QualityStage® Designer client.
  2. In the Repository pane, right-click the Jobs folder, and select New > Parallel job.
  3. From the File section of the palette drag an Unstructured Data stage to the canvas.
  4. From the File section of the palette drag a Sequential File stage to the canvas. Position the stage to the right of the Unstructured Data stage.
  5. Create a link from the Unstructured Data stage to the sequential file stage.
  6. Rename the stages and links.
  7. Select File > Save, and name the job.