Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
Links and link stations z/OS Communications Server: SNA Network Implementation Guide SC27-3672-01 |
|
In Figure 1, if NCP2 is inactive and LINK1 is active, the operator at HOST1 can dump NCP2 by specifying ID=LINKSTA1 on the MODIFY DUMP command. If HOST2 activates NCP3, HOST2 can dump NCP2 by specifying ID=LINKSTA4. Figure 1. Effects of NCP deactivation
on cross-subarea links and link stations
|
Copyright IBM Corporation 1990, 2014
|