Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
Rebuild the structure z/OS MVS Setting Up a Sysplex SA23-1399-00 |
|
Rebuild the structure that has the hung connectors by issuing the following command: SETXCF START,REBUILD,STRNAME=strname (See z/OS MVS System Commands for additional information.) If the structure does not support rebuild, go to Collect documentation. After the REBUILD command is issued, display the structure information by issuing the following command: DISPLAY XCF,STRUCTURE,STRNAME=strname Examine the output of the command (IXC360I) and locate information
about the REBUILD phase and the state of the structure connections. Figure 1 shows an example.
Figure 1. Example: Output from DISPLAY XCF, STRUCTURE,
STRNAME command
Determine if the REBUILD is “hung” by displaying the structure information again. Examine the REBUILD phase of the structure and the state of the connections. If the structure REBUILD is not progressing (for example, the structure is stuck in the REBUILD QUIESCE phase), look for connectors that have an outstanding REBUILD response (denoted by a * to the left of the connection name). Note: Allow some time between issuing the display commands
to ensure that the ACTIVE connectors have had a chance to process
the REBUILD request. Structure REBUILD may take a few minutes. Display
the structure a few times to verify that the REBUILD phase and the
outstanding connector responses (*) are not changing. The REBUILD
phase is displayed in message IXC360I. IXL040E is issued to identify
a response that a connector has not provided in a timely manner.
If the REBUILD is not progressing and one or more of the ACTIVE connectors has an outstanding REBUILD response, the job associated with the connectors that are not responding to REBUILD (IRLMA in the above example), requires recovery actions. Continue with Collect documentation. |
Copyright IBM Corporation 1990, 2014
|