Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
Through CTC devices z/OS MVS Setting Up a Sysplex SA23-1399-00 |
|
If signaling is implemented through CTC devices, the signaling paths cannot be recovered until the hardware recovers. When the hardware recovers, an operator can vary online an operative channel path or device, or the installation can reconnect an ESCON® or FICON® CTC device. |
Copyright IBM Corporation 1990, 2014
|