Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
CASE 1 - An alternate coupling facility is available z/OS MVS Setting Up a Sysplex SA23-1399-00 |
|
When an alternate CF is available, the structure might be able
to be rebuilt from the failed CF to an alternate CF. The possible
results of the rebuild consist of the following:
|
Copyright IBM Corporation 1990, 2014
|