To allow an automatic step restart or an automatic checkpoint/restart,
you must observe the following rules when preparing the job used in
the original execution:
- If a step restart is desired, the RD parameter must be coded to
request the restart.
- If a checkpoint/restart is desired, a DD statement for the checkpoint
data set must be included in the step that executes the CHKPT macro
instruction.
- The EXEC statements in the job must have unique names. (Upon restart,
the system searches for the named step.)
- If commands are in the original job, the commands are not reexecuted
when restart occurs.
- The DD statement VOL=REF parameter is ignored if restart is attempted
from a checkpoint taken when the DD statements are opened out of order
and the referenced DD statement requested nonspecific tape volumes.
- When using passed data sets, the same temporary data set name
should not be reused after the temporary data set has been deleted.
- If the checkpoint data set is SMS-managed, the automatic class
selection (ACS) routine must not override the unit or volume selection.