Step 15: Start the ADNR application

As ADNR connects to the Advisor, an MVS™ console message appears on the MVS console of the system on which ADNR is running. Simultaneously, a message appears on the Advisor's MVS console, indicating that a load balancer connected. If ADNR fails to connect to the Advisor, an eventual action message is displayed on ADNR's MVS console until the connection is successful. ADNR must be started from a job control procedure that is in a procedure library. It cannot be started under BPXBATCH. The IBM-supplied program properties table has entries to make ADNR run non-swappable. You should not override this entry to make ADNR run swappable.