z/OS ISPF Software Configuration and Library Manager Guide and Reference
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


Change Promote Processing (NOPROM)

z/OS ISPF Software Configuration and Library Manager Guide and Reference
SC19-3625-00

Type N on the Library Utility panel or against the member selection list to display the SCLM Not Promoted Member Update panel (FLMUSN#P).

Figure 1. SCLM Not Promoted Member Update panel (FLMUSN#P)
   Menu  SCLM  Utilities  Help
  ──────────────────────────────────────────────────────────────────────────────

                 SCLM Not Promoted Member Update
 Command ===>                                                 

    SCLM Library:
    PROJECT  . . . . : SLMTEST6
    GROUP  . . . . . : DEV1    
    TYPE . . . . . . : SOURCE  
    MEMBER . . . . . : FLM01EQU

    Options
    NOPROM:  1  1. No promote (Rebuild)
                2. No promote (No Rebuild)
                3. Remove no promote status

  F1=Help      F2=Split     F3=Exit      F7=Backward  F8=Forward
  F9=Swap     F10=Actions  F12=Cancel

The fields on this panel are:

PROJECT
The SCLM project currently being maintained.
GROUP
Group of the member that is being changed.
TYPE
Type of the member that is being changed.
MEMBER
Member that is being changed.
NOPROM
Determines how the promote processing for this member is to be modified. Valid values are:
No promote (No Rebuild)
Sets the Accounting Status field in the accounting record to NOPROM-N. On promotion, the member is not copied to the next level. The build maps containing this member are not rebuilt, even if the associated language specifies an FLMLRBLD macro which would cause a rebuild.
No promote (Rebuild)
Sets the Accounting Status field in the accounting record to NOPROM-R. On promotion, the build maps containing this member and the member itself are not copied to the next level. Once the copy phase is complete, SCLM invokes a build to rebuild these build maps using the version of the member at the next level or above.
Remove no promote status
Sets the Accounting Status field in the accounting record to EDITABLE. Normal promotion of the member and associated build maps occurs.

For more information on this option, see the Leaving a Member Behind on Promotion.

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014