HLASM Installation and Customization Guide
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


Installation checklist

HLASM Installation and Customization Guide
SC26-3494-05

Table 1 lists the steps and associated jobs to install High Level Assembler. The remaining sections in this chapter describe each step. You can use Table 1 as a checklist.

Table 1. Summary of steps for installing High Level Assembler
Step Description Installation Job Topic
_1 SMP/E Considerations for Installing High Level Assembler   Step 1: SMP/E considerations for installing High Level Assembler
_2 Copy the Sample JCL from the Product Tape ASMWCOPY Step 2: Copy the sample JCL from the product tape
_3 Set up the ISPF Editor Macro (optional) ASMWEDIT Step 3: Set up ISPF editor macro (optional)
_4 Allocate and Initialize the SMP/E Data Sets (optional) ASMWSMPE Step 4: Allocate and initialize the SMP/E data sets (optional)
_5 Perform SMP/E Receive ASMWRECV Step 5: Perform SMP/E receive
_6 Allocate Target and Distribution Libraries ASMWALOC Step 6: Allocate target and distribution libraries
_7 Create DDDEF Entries ASMWDDEF Step 7: Create DDDEF entries
_8 Perform SMP/E Apply ASMWAPLY Step 8: Perform SMP/E apply
_9 Run the Installation Verification Program ASMWIVP Step 9: Run the installation verification program
_10 Perform SMP/E Accept ASMWACPT Step 10: Perform SMP/E accept

If you have previously installed an earlier release of High Level Assembler, note that the names of the sample jobs have changed from previous releases.

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014