Follow the steps outlined in this road map for installing
your expansion unit.
To install the 5094, 5294, 5096, and 5296 expansion units,
you must perform the following tasks. These tasks are arranged in
a series of chronological steps for installing your expansion unit.
Where appropriate links are available to provide you with additional
detail related to performing these tasks. At the completion of
each task, return to this road map for guidance related to performing
the next task.
- Unpack the expansion unit.
- Complete a parts inventory. For details, see Completing a parts inventory.
- Cable the expansion unit to the server:
Note: - This unit uses remote input/output (RIO) and system power control
network (SPCN) cables to connect to the server.
- You may need to power off the server before connecting the cables.
- Do not perform remote input/output and high-speed Link (RIO/HSL)
configuration changes, such as moving existing expansion units to
different GX adapters, at the same time you add new expansion units.
- If you are adding a new expansion unit or migrating expansion
units from another IBM® POWER® server, you may not be able
to allocate the expansion unit resources to logical partitions on
the new server until an SPCN firmware update is completed for the
expansion units.
- For detailed procedures related to preparing to connect your
expansion units, see Prepare to connect your expansion units and
perform all applicable prerequisites for installing your expansion
units.
- For a detailed procedure that helps you connect your expansion
units to the system, see Connect
your expansion units.
- Connect power cables and apply power.
- Verify that the SPCN is functioning correctly. For details,
see Verify the System Power Control Network.
- Verify that the new expansion unit configuration is functioning
properly. For details, see Verify that
the new configuration is functioning.