APAR status
Closed as program error.
Error description
Client installs AD 5.1.0.0 on a server using the hostname of "localhost" and configures the server. In the process "localhost" (without the quotes) is used in all UNC path names in the server's configuration. All functionality seems to work fine and (local) Analyze Client is able to view analysis options for the projects, except that when trying to view a Flow Chart, a message like the following is displayed in Analyze Client: " Invalid flowchart file for PGMABCD_6.xml!" where PGMABCD is the name of the program for which the user was trying to generate a flowchart.
Local fix
Problem summary
"localhost" is not resolved correctly as "127.0.0.1" in some specific situations.
Problem conclusion
Code was changed so that "localhost" is correctly resolved as "127.0.0.1".
Temporary fix
Comments
APAR Information
APAR number
PH07664
Reported component name
APPL DISCOVERY
Reported component ID
5737B1600
Reported release
510
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-01-23
Closed date
2021-01-14
Last modified date
2021-01-14
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
flowchrt
Fix information
Fixed component name
APPL DISCOVERY
Fixed component ID
5737B1600
Applicable component levels
[{"Line of Business":{"code":"LOB35","label":"Mainframe SW"},"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRR9Q","label":"IBM Application Discovery for IBM Z"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"510"}]
Document Information
Modified date:
15 January 2021