IBM Support

PK95202: SCHEDULED SYNCHS IN THE DOORS/QC INTEGRATION CAN BE RUN ONLY ONCE PER DAY.

Subscribe

You can track all active APARs for this component.

APAR status

  • Closed as documentation error.

Error description

  • TLOG#52947
    Scheduled synchronizations with the DOORS/QC integration will
    only run once in any given twenty four hour period. Rescheduling
    on the same day will not work. This is not documented.
    

Local fix

  • Run a manual synch if it is required for a task to run more than
    once a day.
    

Problem summary

  • Scheduled synchronizations with the DOORS/QC
    integration only run once in any given twenty four hour period.
    Rescheduling on the same day will not work. This is not
    documented.
    

Problem conclusion

  • This is now documented in DOORS/HP Quality Center Interface
    (3.4.0.1) Admin Console Help.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PK95202

  • Reported component name

    TLOGIC DOORS

  • Reported component ID

    5724V61DR

  • Reported release

    920

  • Status

    CLOSED DOC

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2009-09-01

  • Closed date

    2009-12-07

  • Last modified date

    2009-12-24

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels



Document information

More support for: Rational DOORS

Software version: 9.2

Reference #: PK95202

Modified date: 24 December 2009