IBM Support

PI51967: SCHEDULING A TEST ON RTCP USES LARGE AMOUNTS OF MEMORY

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When you schedule a test you need many more times the project
    size allocated in Library Manager.
    A 512MB project multiplies several times and causes RIT to fail.
    Are unnecessary copies of the project and ZIP being held onto?
    
    RTCP also needs a large amount of memory to deal with this, is
    it just 1x or 2x?
    

Local fix

  • Ensure sufficient memory is available.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All users of IBM Rational Integration Tester (RIT) and IBM   *
    * Rational Test Control Panel (RTCP) who are publishing stubs  *
    * or scheduling tests from very large projects.                *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Publishing stubs and scheduling tests from very large        *
    * projects can fail and cause RIT to run out of memory.        *
    * A complete image copy of the project was generated in memory *
    * to send to RTCP.                                             *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Rational Integration Tester version 9.0.      *
    ****************************************************************
    Reduce the size of large projects if possible.  Try not to
    include files that are not essential to running such as
    documentation or saved messages from Recording Studio.
    Allocate more memory in Library Manager and re-start RIT.
    

Problem conclusion

  • Memory handling has been greatly improved in version 9.0 of IBM
    Rational Integration Tester.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI51967

  • Reported component name

    RATL INTEGRA TE

  • Reported component ID

    5725G79IT

  • Reported release

    870

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-11-05

  • Closed date

    2016-03-17

  • Last modified date

    2016-03-17

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL INTEGRA TE

  • Fixed component ID

    5725G79IT

Applicable component levels

  • R800 PSN

       UP

  • R801 PSN

       UP

  • R850 PSN

       UP

  • R851 PSN

       UP

  • R860 PSN

       UP

  • R870 PSN

       UP

  • R871 PSN

       UP

  • R900 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSBLQQ","label":"Rational Test Workbench"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.7","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
15 October 2021