Fixes are available
Rational Integration Tester Fix Pack 1 (9.0.0.1) for 9.0.0
Rational Performance Test Server Fix Pack 1 (9.0.0.1) for 9.0.0
Rational Test Virtualization Server Fix Pack 1 (9.0.0.1) for 9.0.0
Rational Performance Test Server 9.0.1
Rational Integration Tester 9.0.1
Rational Test Virtualization Server 9.0.1
Rational Integration Tester 9.1
Rational Test Virtualization Server 9.1
Rational Performance Test Server 9.1
APAR status
Closed as program error.
Error description
In Test Factory, in some circumstances choosing a new test in the Task Monitor after closing the Message Differences Window will result in results from another task to be displayed in the Console window STEPS TO REPRODUCE: 1. Create several test cases with a request/response and execute them. Executed test cases will be listed in Task Monitor area of the Test Lab module. 2. Click on a test case (test case A) in the Task Monitor area. Note the test case A will be highlighted. 3. Click on a log from the console area to launch comparator window. 4. Close the Message Differences Window by clicking on the [X] in the upper right corner of window 5. While the Message Differences Window is closing, click on a different test case (test case B). 6. Test case B will be highlighted in the Task Monitor area 7. Check the test case name displayed in the Console area EXPECTED RESULTS: At step 7, Console will display log for test case B ACTUAL RESULTS: At step 7, Console displays log for test case A. When theTest Case B is selected in the Tast Monitor area, the log displayed in the Console area is for A. WORKAROUND: Wait for the Message Differences Window to completely close before selecting a new test in the Task Monitor window
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All users of Rational Integration Tester working with the * * task monitor and console in the test factory * **************************************************************** * PROBLEM DESCRIPTION: * * When the machine running RIT is under moderate to heavy CPU * * load, it's possible to get the Task Monitor and Console in * * Test Factory to be out of synch. * **************************************************************** * RECOMMENDATION: * * Upgrade to Rational Integration Tester v9.0.1 which includes * * a fix for this issue. However, as a workaround, it is also * * possible to avoid the issue by waiting for the Message * * Differences Window to completely close before selecting a * * new test in the Task Monitor window * ****************************************************************
Problem conclusion
A fix for this issue was provided in version 9.0.1 of Rational Integration Tester.
Temporary fix
Comments
APAR Information
APAR number
PI38278
Reported component name
RATL INTEGRA TE
Reported component ID
5725G79IT
Reported release
860
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2015-04-01
Closed date
2016-09-20
Last modified date
2016-09-20
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL INTEGRA TE
Fixed component ID
5725G79IT
Applicable component levels
R800 PSN
UP
R801 PSN
UP
R850 PSN
UP
R851 PSN
UP
R860 PSN
UP
R870 PSN
UP
R871 PSN
UP
R900 PSN
UP
R901 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSBLQQ","label":"Rational Test Workbench"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.6","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
14 October 2021