IBM Support

PI33025: TAGS CONFIGURED UNDER MESSAGE SELECTOR IN SUBSCRIBE ACTION DISAPPEAR AFTER DRAGGING A REQUIREMENT ONTO THE ACTION

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Steps to reproduce:
    Create message in Requirements library
    Create a test and add Subscribe action in Test Factory
    Open the Subscribe action and add a tag for example, for
    Correlation ID
    Save the chage
    Drag the requirement into the Subscribe action
    Select "Update this action with a link to the requirement"
    Open the Subscribe action
    You will find the tag disappears
    
    Expected results:
    Requirement dragged into Subscribe action is linked correctly to
    the action and tags configured before linking the requirement
    stay as they are set
    
    Workkaround:
    None
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All users of Rational Integration Tester with the WebSphere  *
    * MQ transport                                                 *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When a Linked Requirement containing a WebSphere MQ message  *
    * was dragged into the Test Tree, then, in some circumstances, *
    * all fields were cleared in the new message in the test.      *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • This problem was resolved in version 8.7.0 of Rational
    Integration Tester
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI33025

  • Reported component name

    RATL INTEGRA TE

  • Reported component ID

    5725G79IT

  • Reported release

    860

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2015-01-20

  • Closed date

    2015-04-12

  • Last modified date

    2015-04-12

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL INTEGRA TE

  • Fixed component ID

    5725G79IT

Applicable component levels

  • R870 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSBLQQ","label":"Rational Test Workbench"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.6","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
17 October 2021