Fixes are available
Rational Integration Tester 8.7
Rational Test Virtualization Server 8.7
Rational Performance Test Server 8.7
Rational Test Virtualization Server Fix Pack 1 (8.7.0.1) for 8.7
Rational Integration Tester Fix Pack 1 (8.7.0.1) for 8.7
Rational Performance Test Server Fix Pack 2 (8.7.0.2) for 8.7
Rational Integration Tester Fix Pack 2 (8.7.0.2) for 8.7
Rational Test Virtualization Server Fix Pack 2 (8.7.0.2) for 8.7
Rational Test Virtualization Server Fix Pack 3 (8.7.0.3) for 8.7
Rational Integration Tester Fix Pack 3 (8.7.0.3) for 8.7
Rational Performance Test Server Fix Pack 1 (8.7.0.1) for 8.7
Rational Integration Tester Fix Pack 4 (8.7.0.4) for 8.7
Rational Test Virtualization Server Fix Pack 4 (8.7.0.4) for 8.7
Rational Performance Test Server Fix Pack 4 (8.7.0.4) for 8.7
Rational Performance Test Server Fix Pack 3 (8.7.0.3) for 8.7
APAR status
Closed as program error.
Error description
A stub created (or modified) in the test editor and given a timeout cannot be run. The error is: [28/10/2014 08:39:23.400] [Warning] This Stub is being executed in IBM Rational Integration Tester, and will run for a maximum of 5 minutes. [28/10/2014 08:38:30.172] [Error] [CRRIT8113E] Compilation Failed [28/10/2014 08:39:23.400] [Error] Message Switch:to file "%%PROJECT/ROOT%%\input.txt" timeout 12345.0ms via "file" Message Switch to file "%%PROJECT/ROOT%%\input.txt" timeout 12345.0ms via "file": [CRRIT8838E] Timeout must be a valid number! Use '0' to indicate no timeout.
Local fix
This can be worked around by: - close the stub in Test Factory, - open the ".stb" file in a text editor, - search for regular expression timeout="\d+\.0" - and remove the .0 - before saving from the text editor - and running the stub.
Problem summary
**************************************************************** * USERS AFFECTED: * * All users of Rational Integration Tester who create or edit * * stubs in the (legacy) test editor. * **************************************************************** * PROBLEM DESCRIPTION: * * A stub created (or modified) in the test editor and given a * * timeout cannot be run. * **************************************************************** * RECOMMENDATION: * * Upgrade to Rational Integration Tester v8.7.0, which * * includes a fix for this issue. * ****************************************************************
Problem conclusion
A fix for this issue was provided in version 8.7.0 of Rational Integration Tester. The timeout field incorrectly accepted double values, creating a decimal point for integer values.
Temporary fix
Comments
APAR Information
APAR number
PI28521
Reported component name
RATL INTEGRA TE
Reported component ID
5725G79IT
Reported release
860
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-10-28
Closed date
2015-05-21
Last modified date
2015-05-21
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL INTEGRA TE
Fixed component ID
5725G79IT
Applicable component levels
R800 PSN
UP
R801 PSN
UP
R850 PSN
UP
R851 PSN
UP
R860 PSN
UP
R870 PSY
UP
Document Information
Modified date:
14 October 2021