IBM Support

IT29269: DATAPOWER MIGHT RELOAD IF THE HTTP FRONT SIDE CONNECTION TERMINATED BEFORE THE ASYNC ACTION IN B2B GATEWAY COMPLETED

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

APAR status

  • Closed as program error.

Error description

  • DataPower might reload if the http front side connection
    terminated before the async action which configured/used in the
    B2B Gateway has not completed.
    

Local fix

  • Use Sync action instead of Async action.
    

Problem summary

  • DataPower might unexpectedly reload when processing
    asynchronous actions in the processing policy of the partner
    profile of the B2B gateway. The reload might occur when the
    asynchronous action being performed and the front side
    connection already closed.
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    IT29269

  • Reported component name

    DATAPOWER

  • Reported component ID

    DP1234567

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-05-27

  • Closed date

    2019-07-23

  • Last modified date

    2019-07-24

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    DATAPOWER

  • Fixed component ID

    DP1234567

Applicable component levels



Document information

More support for: IBM DataPower Gateways
General

Software version: 760

Reference #: IT29269

Modified date: 24 July 2019