IBM Support

IT23985: IBM DATAPOWER NEEDS TO COME UP ONLY AFTER NETWORK SUBSYSTEM IS UP

Subscribe

You can track all active APARs for this component.

APAR status

  • Closed as program error.

Error description

  • - Make sure we only come up after the network subsystem is up.
    (#2)
    - Add some sort of message that indicates DataPower was not
    able to mount the host filesystem so the failure does not
    happen silently.
    

Local fix

  • Manually add After=network-online.target in datapower.service.
    

Problem summary

  • DataPower systemd service will start after multi-user.target
    and network-online.target.
    

Problem conclusion

Temporary fix

  • Manually Add After=multi-user.target network-online.target to
    the datapower.service configuration.
    

Comments

APAR Information

  • APAR number

    IT23985

  • Reported component name

    DATAPOWER

  • Reported component ID

    DP1234567

  • Reported release

    752

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-02-07

  • Closed date

    2018-03-14

  • Last modified date

    2018-03-21

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • 0
    

Fix information

  • Fixed component name

    DATAPOWER

  • Fixed component ID

    DP1234567

Applicable component levels

  • R760 PSY

       UP



Document information

More support for: IBM DataPower Gateways
General

Software version: 752

Reference #: IT23985

Modified date: 21 March 2018