IBM Support

IJ16761: USING REPAIR LOCATION START AND REPAIR LOCATION FINISH A RACE CONDITION THAT LEADS TO AND INFINITE LOOP

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • When a user creates an assignment the week before it will be
    used (on a Friday),
    the following monday, the assignment is no longer able to
    be opened. The browser is stuck displaying "Loading Layout" when
    opening the Work View tab.
    If the user  creates a new schedule with exactly the same
    information on the Monday,that schedule will work for the rest
    of the week.
    
    
    Steps to Reproduce:
    Pre-requisite:
    1. Go to Administration<Calendars
    2. Recall DAY calendar and ensure that End Date includes this
    year.
    3. Ensure that Day shift has been applied to calendar
    
    Steps:
    1. Go to Work Order Tracking and insert a new record
    Scheduled Start Date= the next Friday's date, time=12:00 PM,
    Scheduled End Date= same day as SSD, time = 1 hour later
    Duration=1
    2. Go to Plans tab Labor sub-tab, New Row, Craft=FACILCUS,
    Regular Hours = 1
    3. Save record
    4. Go to Graphical Scheduling application and insert new record
    Schedule=1234, Calendar=DAY Org=EAGLENA, Shift=DAY, Duration in
    Days=7  Work Queries, click new row,
    Where Condition = wonum='your_workorder_above"
    Restrict Resource Availability, click new row,
    Where Clause= 1=1,
    5. Save record
    6. Go to Graphical Assignment
    7. Common Actions<Create Work List from schedule
    7. Select Schedule created above and click OK
    8. Work List=MYWList
    9. Save record
    10. Return to Graphical Assignment the following monday
    11. Recall schedule created above
    12. Click on Work View tab
    
    RESULTS: the browser is stuck displaying "Loading Layout".
    High cpu usage may also occur during this message.
    
    EXPECTED RESULT:
    Data should be displayed on the Work View tab
    .
    Additional Comments
    If a new schedule with exactly the same information is created
    on the same monday, that schedule will work for the rest of the
    week.
    
    .
    Application
    Graphical Assignment
    
    REPORTED IN VERSION:
    Maximo Asset Management 7.6.1.0
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application in Maximo      *
    * Scheduler.                                                   *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * USING REPAIR LOCATION START AND REPAIR LOCATION FINISHA RACE *
    * CONDITION THAT LEADS TO AND INFINITE LOOP                    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been made.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ16761

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-06-13

  • Closed date

    2019-06-17

  • Last modified date

    2019-06-17

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
17 June 2019