IBM Support

IJ15795: CALENDAR BREAKS IGNORED BY THE "ASSIGN AVAILABLE LABOR" TOOL

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM:  Calendar breaks ignored by the "Assign Available
    Labor" option
    
    
    STEPS TO REPRODUCE:
    1. Go to Calendar application and apply breaks to the calendar
    via  Define / Apply Shifts  action
    2. Go to Graphical Assignment application and bring up a work
    list
    3. Select "Assignment View" tab and highlight multiple
    unassigned work orders. Right click an applicable labor and
    select the "Assign Available Labor" option
    
    
    RESULTS:  The suggested assignments do not consider the breaks
    on the calendar
    
    
    EXPECTED RESULTS: Calculated times should consider calendar
    breaks and not suggest a sequence that places work orders
    within them.
    
    
    PRODUCT VERSION:
    IBM Maximo for Scheduler 7.6.7.0
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * scheduler                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Calendar breaks ignored by the "Assign Available             *
    * Labor" option                                                *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.2 of Base
    Services(Scheduler 7674)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ15795

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-04-30

  • Closed date

    2019-05-21

  • Last modified date

    2019-05-21

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
21 May 2019