IBM Support

IJ15580: GA - PROBLEM WITH THE ASSIGNMENT MANAGER TAB AND ASSIGN AVAILABLE LABOR ACTION

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

APAR status

  • Closed as program error.

Error description

  • PROBLEM: Assign Available Labor action cause problem on Time
    Zone and refresh after perform the action
    PERFORMANCE ISSUE: N
    STEPS TO REPRODUCE:
    Go to Graphical Assignment application
    Load a list of Work Orders and assignments (Calendar, Shift and
    Work Order queries)
    Open the Assignment View
    Click over two or more Wait for Assignment records and Right
    Click over the Resource on the Labor side
    Select the Assign to Available  Labor action
    Click OK at the Assignment dialog
    it closes and just a single record get on Assignment
    CURRENT ERRONEOUS RESULT:
    It will require the user to Refresh the view to get the second
    record
    EXPECTED RESULT:
    It should refresh with both records on that view.
    

Local fix

  • Perform the Refresh action after perform the action.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application in Scheduler   *
    * 7.6.7.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * PROBLEM WITH THE ASSIGNMENT MANAGER TAB AND ASSIGN AVAILABLE *
    * LABOR ACTION                                                 *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been made.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ15580

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-04-18

  • Closed date

    2019-04-29

  • Last modified date

    2019-04-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP



Document information

More support for: Maximo Asset Management Scheduler

Software version: 767

Reference #: IJ15580

Modified date: 29 April 2019