IBM Support

IJ14162: SCREEN JUMPING BACK TO ANOTHER DATE PERIOD AFTER MOVING A WORK RECORD IN GRAPHICAL SCHEDULING APPLICATION

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Ø
    Problem Description
    Gantt view in the Graphical screen jumping back to another date
    period after moving a work record
    
    
    STEPS TO REPRODUCE:
    1) Go to Graphical Scheduling application and go to "Graphical
    View" tab
    
    
    2) Right click on a Work bar in the Gantt Chart and select
    "Move to Day" and select a date from the calendar
    
    
    
    RESULTS: Gantt Chart refreshes back to another earlier date
    period
    
    
    EXPECTED RESULTS: Gantt Chart should show the same date period
    
    
    
    REPORTED IN VERSION
    Maximo Asset Management 7.6.1
    IBM Maximo for Scheduler 7.6.7.1
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Scheduling and Graphical Scheduling   *
    * Large Projects application in Scheduler 7.6.7.               *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * SCREEN JUMPING BACK TO ANOTHER DATE PERIOD AFTER MOVING A    *
    * WORKRECORD IN GRAPHICAL SCHEDULING APPLICATION               *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been made to address this problem.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ14162

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-02-26

  • Closed date

    2019-02-28

  • Last modified date

    2019-02-28

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
28 February 2019