IJ13095: GRAPHICAL SCHEDULING - WHEN A SCHEDULE IS COMMITTED, THE RESOURCES SECTION BELOW THE GANTT DOES NOT RELOAD

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In Graphical Scheduling (GS) when the schedule is committed the
    Graphical View is supposed to fully repaint.  But due to this
    problem only the Gantt repaints, the Resources section at the
    bottom of the screen does not repaint, it is left blank.
    
    STEPS TO REPRODUCE:
    1. Use an existing Schedule or create a new one with at least a
        few WO.
    2. Click on the Graphical View tab.
    3. Change the date on one of the bars in any fashion you choose.
    4. Click on Commit Changes and answer yes to the prompt to
        commit the changes.
    5. The Graphical View tab will start to repaint after the WO
        are committed but only the top repaints.
    
    RESULTS:
    The lower Resources section that shows the usage and
    availability of the Crafts does not repaint.   You have to
    click on another tab and then back on the Graphical View tab to
    get it to repaint.
    
    EXPECTED RESULTS:
    The whole Graphical View should repaint, both the Gantt at the
    top and the Resources section at the bottom.
    
    REPORTED IN VERISON:
    Maximo 7.6.0.9 IFIX 13
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo scheduler users                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * n Graphical Scheduling (GS) when the schedule is committed   *
    * the                                                          *
    * Graphical View is supposed to fully repaint.  But due to     *
    * this                                                         *
    * problem only the Gantt repaints, the Resources section at    *
    * the                                                          *
    * bottom of the screen does not repaint, it is left blank.     *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • get fix from next release TPAE 7611(Scheduler 7673)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ13095

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-01-28

  • Closed date

    2019-01-31

  • Last modified date

    2019-01-31

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
31 January 2019