IBM Support

IJ12953: DATE FORMAT INCORRECT IN GRAPHICAL ASSIGNMENT VIEW

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The DISPLAYDATE system property is set to dd/MM/yyyy and
    most of the dates in Graphical Assignment and Scheduler are
    correct. However, there are a couple of places which do not
    conform to this format:
    a) Graphical Assignment (Assignment View) for start and end
    time;
    b) Graphical Scheduling (Large Projects) for start and end date.
    The format for the above is mm/dd/yyyy.
    STEPS TO REPRODUCE:
    1) Planning and Scheduling > Graphical Assignment;
    2) Choose a Work Item > Assignment View;
    3) Start and End TIME (includes date) has incorrect date
    format.
    4) I have tested this on Scheduler 7670 and 7671 -
    can either change the locale to "en_AUS" or the DISPLAYDATE to
    the correct format. However, points (a) and (b) remain
    incorrect format.
    RESULTS: Date format is incorrect.
    EXPECTED RESULTS: Date format should conform to the DISPLAYDATE
    or browser settings.
    REPORTED IN VERSION:
    IBM Maximo Asset Management Scheduler 7.6.7.1 Build
    20180718-1141 DB Build V7671-13
    IBM Maximo Asset Management Scheduler Plus 7.6.7.1 Build
    20180718-1141 DB Build V7671-01
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application in Scheduler   *
    * 7.6.7.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Date Format incorrect in Graphical Assignment and Graphical  *
    * Scheduling Large Projects                                    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been made.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ12953

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-01-22

  • Closed date

    2019-03-29

  • Last modified date

    2019-03-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
29 March 2019