IJ12795: INTERRUPTIBLE TIME NOT SHOWN IN GRAPHICAL ASSIGNMENT WHEN 2 OVERLAPPING SHIFTS ARE USED.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Unable to see interruptible time in the graphical assignment
    application when on the assignment view tab and the record has
    2 or more overlapping shifts.
    1. Create a new GA record, add a calendar that has 2 over
    lapping shifts, if you do not have one create one.
    2. Add the shifts that are on the calendar created. If needed
    create a new calendar and use Company1 and Day shifts as they
    overlap.
    3. Add a location to the query section so that work orders will
    be returned.
    4. On the work view tab, select all records, move them to
    today's date and save.
    5. Notice on the work view tab we can see the working and
    non-working time.
    6. Move to the assignment view tab, notice there is no
    non-working time shown as there is on the work view tab.
    EXPECTED RESULTS
    That non-working time would still be shown.
    REPORTED IN VERSION:
    Maximo 7.6.1 with Scheduler 7.6.7.1
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo scheduler                                             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Unable to see interruptible time in the graphical assignment *
    * application when on the assignment view tab and the record   *
    * has                                                          *
    * 2 or more overlapping shifts.                                *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.1 of Base
    Services(Scheduler 7672)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ12795

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-01-16

  • Closed date

    2019-02-12

  • Last modified date

    2019-02-12

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
12 February 2019