IJ11189: WORK ORDER DESCRIPTION DOES NOT DISPLAY THE REVISED JOB PLAN'S DESCRIPTION

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

APAR status

  • Closed as program error.

Error description

  • Change the description on a job plan making it revised, then on
    the Condition Monitoring application, generate a work order, the
     work order description takes the original job plan's
     description not the revised.
    
    STEPS TO REPRODUCE:
    
    Created Job Plan: TESTJPDF testing for df regarding description
    on jp
    Template Type: Maintenance
    Duration: 0:30
    Job Plan Tasks section
    Click New Row
    Task: 10 testing for df on description
    Details section
    Duration: 0:30
    Save
    Change Status: ACTIVE
    Go To Assets > Assets
    Asset: TESTDFASSET
    Meters tab
    Meter: O-PRESSUR
    Go To Assets > Condition Monitoring
    Selected Point: 1005
    Asset: TESTDFASSET
    Meter: O-PRESSUR
    Upper Limits section
    Upper Warning Limit: 5,000.000
    Upper Action Limit: 5,500.000
    Upper Limit Job Plan: TESTDFJP
    Upper Limit Priority: 2
    Lower Warning Limit: 3,500.000
    Lower Action Limit: 3,200.000
    Lower Limit Job Plan: TESTJPDF
    Lower Limit Priority: 2
    Save
    Go to Assets
    Asset: TESTDFASSET
    Meter tab
    Meter: O-PRESSUR
    Select Action > Enter Meter Readings
    Meter: O-PRESSUR
    New Reading: 5,506.000
    New Reading Date: 11/1/18 1:50 PM
    Inspector: WILSON
    Go To Job Plans
    Job Plan: TESTJPDF testing for df regarding description on jp
    Select Action > Revise Job Plan
    Description: testing for df regarding description on jp REVISED
    Job Plan Tasks section
    New Row
    Task: 20 the next step
    Save and Change Status: ACTIVE
    Go To Assets > Condition Monitoring
    Point: 1005
    Select Action > Generate Work Order
    BMXAA2822I - BMXAA2822I - Work order 1205 generated from measure
    point 1005.
    Work Order: 1205
    Go To Work Orders > Work Order Tracking
    WO: 1205 - testing for df regarding description on jp
    The description is from the original job plan
    
    Actual Behavior: Description of original job plan pulled into
    the work order description.
    
    Expected Behavior: Description of the revised job plan pulled
    into the work order description.
    
    
    REPORTED IN VERSION:
    
    7.6.0.9 and 7.6.1.0
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Maximo users of Condition Monitoring                         *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Work orders generated from a Condition Monitoring measure    *
    * point that uses a job plan that has been revised receive the *
    * description of the original job plan instead of the ACTIVE   *
    * revision.                                                    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    Change the description on a job plan making it revised, then on
    the Condition Monitoring application, generate a work order, the
    work order description takes the original job plan's description
    not the revised description.
    
    STEPS TO REPRODUCE:
    
    Created Job Plan: TESTJPDF testing for df regarding description
    on jp
    Template Type: Maintenance
    Duration: 0:30
    Job Plan Tasks section
    Click New Row
    Task: 10 testing for df on description
    Details section
    Duration: 0:30
    Save
    Change Status: ACTIVE
    
    Go To Assets > Assets
    Asset: TESTDFASSET
    Meters tab
    Meter: O-PRESSUR
    
    Go To Assets > Condition Monitoring
    Selected Point: 1005
    Asset: TESTDFASSET
    Meter: O-PRESSUR
    Upper Limits section
    Upper Warning Limit: 5,000.000
    Upper Action Limit: 5,500.000
    Upper Limit Job Plan: TESTDFJP
    Upper Limit Priority: 2
    Lower Warning Limit: 3,500.000
    Lower Action Limit: 3,200.000
    Lower Limit Job Plan: TESTJPDF
    Lower Limit Priority: 2
    Save
    
    Go to Assets
    Asset: TESTDFASSET
    Meter tab
    Meter: O-PRESSUR
    Select Action > Enter Meter Readings
    Meter: O-PRESSUR
    New Reading: 5,506.000
    New Reading Date: 11/1/18 1:50 PM
    Inspector: WILSON
    
    Go To Job Plans
    Job Plan: TESTJPDF testing for df regarding description on jp
    Select Action > Revise Job Plan
    Description: testing for df regarding description on jp REVISED
    Job Plan Tasks section
    New Row
    Task: 20 the next step
    Save and Change Status: ACTIVE
    
    Go To Assets > Condition Monitoring
    Point: 1005
    Select Action > Generate Work Order
    BMXAA2822I - BMXAA2822I - Work order 1205 generated from measure
    point 1005.
    Work Order: 1205
    
    Go To Work Orders > Work Order Tracking
    WO: 1205 - testing for df regarding description on jp
    The description is from the original job plan
    
    Actual Behavior: Description of original job plan pulled into
    the work order description.
    
    Expected Behavior: Description of the revised job plan pulled
    into the work order description.
    

Problem conclusion

  • The fix for this APAR is contained in the following maintenance
    package:
    	| release\fix pack\interim fix for Release 7.6.1.1
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ11189

  • Reported component name

    MAXIMO PLANNING

  • Reported component ID

    5724R46PL

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-11-14

  • Closed date

    2018-11-28

  • Last modified date

    2018-11-28

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO PLANNING

  • Fixed component ID

    5724R46PL

Applicable component levels

  • R760 PSY

       UP



Document information

More support for: Maximo Asset Management

Software version: 760

Reference #: IJ11189