IBM Support

IJ10929: GRAPHICAL ASSIGNMENT & GRAPHICAL SCHEDULING UNABLE TO SCROLL VERTICALLY

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • STEPS TO RECREATE ON TPAE 7.6.0.9 IFIX010 :
    1) Go to Graphical Assignment.
    
    2) Choose a Work List, eg. MAY7.
    
    3) Go to the Assignment View tab.
    
    
    4) Pick an item (MAY7ELEC) and drag it horizontally, this works
    fine.
    
    
    5) Pick that same item and drag it vertically to assign to a
    different resource, pull it all the way to the bottom of the
    screen.
    
    6) When you get to the bottom of the screen it stops rather
    than paging.
    
    CURRENT ERRONEOUS RESULT: Unable to scroll vertically (it just
    stops).
    
    EXPECTED RESULT: You should be able to scroll vertically in
    Graphical Assignment and Graphical Scheduling.
    
    PRODUCT VERSION:
    TPAE 7.6.0.9-IFIX20180906 HF7609-06
    IBM Maximo Asset Management Scheduler 7.6.7.0 Build 20171127
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application in Scheduler   *
    * 7.6.7.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * GRAPHICAL ASSIGNMENT & GS UNABLE TO SCROLL VERTICALLY        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered to the stream.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ10929

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-10-31

  • Closed date

    2018-11-09

  • Last modified date

    2018-11-09

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
09 November 2018