IJ10149: RIGHT CLICK LOCK OPTION IN GRAPHICAL ASSIGNMENT DOES NOT LOCK ASSIGNMENT WHEN THERE IS AN APPOINTMENT REQUIRED ON WORK ORDER

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • An ifix has broken the right click lock option available in the
    graphical assignment application. When a work order has an
    appointment required option as true and we have used the right
    click to lock the assignment we should not be able to move the
    record to a new date, but we can as of the latest available
    ifix.
    STEPS TO REPRODUCE:
    1. Create a new work order, place a check mark in the
    appointment required box, add a target start date and a
    duration of 1 hour.
    2. On the plans tab add a labor and craft save.
    3. Copy the work order number and head to the graphical
    assignment application and create a new record.
    4. Add you calendar, shift and in the query section add a new
    row and add your work order number and save.
    5. On the work view tab assign the assignment to a labor.
    6. On the assignment view tab locate the assignment. Once found
    right click and chose the lock option and save, the record is
    now saved.
    7. Right click again and select move to next day, the record is
    moved.
    ACTUAL RESULT:
    When a work order has an
    appointment required option as true and we have used the right
    click to lock the assignment we should not be able to move the
    record to a new date, but we can as of the latest available
    ifix.
    EXPECTED RESULT:
    As per IBM documentation once an appointment is required and
    the assignment is locked we should not be able to move the
    record.
    PRODUCT VERSION:
    Tivoli's process automation engine 7.6.0.9-IFIX20180906-0926
    Build 20171127-0100 DB Build V7609-45 HFDB Build HF7609-06
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of Graphical Assignment application in Scheduler       *
    * 7.6.7.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * RIGHT CLICK LOCK OPTION IN GRAPHICAL ASSIGNMENT DOES NOT     *
    * LOCK  ASSIGNMENT WHEN THERE IS AN APPOINTMENT REQUIRED ON    *
    * WORK ORDER                                                   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ10149

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-10-05

  • Closed date

    2018-10-22

  • Last modified date

    2018-10-22

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]