Error description

  • PROBLEM DESCRIPTION:
    Changing the status of an eSIG enabled PM and if the PM has a
    forecast, the eSIG gets caught in a loop.
    
    STEPS TO REPRODUCE:
    Enable the eSig Action for the PM application:
    
    1. Go to the Database Configuration application.
    
    2. Find the PM object.
    
    3. In the More Actions section select Manage eSig
    Actions.
    
    4. In the dialog box, in the Applications section
    filter on PREVENTATIVE  to bring up the Preventative
    Maintenance application and click on it.
    
    5. In the Options for Clear Changes section, find and
    tick the check boxes for the  Change Status and
    Save PM options.
    
    6. Save.
    ESig will now be enabled.
    
    7. Go to the PM application.
    
    8. Create a PM and change its status - you will be asked for
    your signature and comment then the PM will be updated.
    
    9. Now generate a forecast for the same PM (More Actions,
    Generate Forecast).
    
    10. Now try to change the status as you did in step 8 above.
    
    ERRONEOUS RESULT:
    You are asked repeatedly, in a loop, for your signature.  The
    only way out of the loop is to cancel.
    
    EXPECTED RESULTS:
    There should not be any looping.
    
    PRODUCT VERSION:
    7.6.0.8
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Maximo users who enabled Esig on the PM app                  *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Esig and OK/Cancel dialog boxes were stuck in a loop when    *
    * changing status from active to inactive/draft on a PM with   *
    * forecast records.                                            *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • This is fixed in the code.
    
    The fix for this APAR is contained in the following maintenance
    package:
    	 | release\fix pack | Interim Fix for Release 7.6.1.1 Product
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ07338

  • Reported component name

    PREVENTIVE MAIN

  • Reported component ID

    5724R46PM

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-06-24

  • Closed date

    2018-11-19

  • Last modified date

    2018-11-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • Maximo
    

Fix information

  • Fixed component name

    PREVENTIVE MAIN

  • Fixed component ID

    5724R46PM

Applicable component levels

  • R760 PSY

       UP



Document information

More support for: Maximo Asset Management
Prev Maint

Software version: 760

Reference #: IJ07338

Modified date: 19 November 2018