IBM Support

IJ06468: ASSIGN TO AVAILABLE LABOR WHEN THE WARNING WORK ZONE FLAG IS ON CAUSE A PROBLEM OF BLANK DIALOG

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM:
    GA- Assign to Available Labor when the warning Work Zone flag
    is ON Cause a Problem of Blank Dialog
    PERFORMANCE ISSUE: NO
    STEPS TO REPRODUCE:
     -Need at least one Work with 20 hours of duration and need
    for some Craft that you have labors
     -Have a calendar with minimum of 120 days and at least one
    Shift applied
    -Have the Warning outside Work Zone Flag ON for the Organization
    Test Steps
     - Go to Graphical Assignment application and create a new
    record
     - Setup with the Calendar, Shift and Org
     - Make sure to have the Work List of 30 days
     - Enter a New Query to look for the work Order that you
    enter
     - Go to Assignment View Tab
     - Select the orange bar
     - Right click over some labor
     - Select the Available Labor
     - Assign to Available Labor
    
    CURRENT ERRONEOUS RESULT: The dialog open as blank
    EXPECTED RESULT:   It should be able to select the record
    without problem and spit the work
    ADDITIONAL INFO: NO
    ENVIRONMENT (SYSTEM INFO):
    App Server Weblogic Application Server 12.1.1.0
    Version
    Tivoli's process automation engine 7.6.0.9-IFIX20180509-1345
    Build 20171127-0100 DB Build V7609-45 HFDB Build HF7609-04
    IBM TPAE Integration Framework 7.6.0.9 Build 20171127-2330 DB
    Build V7609-32
    IBM Maximo Asset Management Scheduler Plus 7.6.7.0 Build
    20171127-0100 DB Build V7670-01
    IBM Maximo Asset Management Scheduler 7.6.7.0 Build
    20171127-0100 DB Build V7670-56 HFDB Build HF7670-17
    IBM Maximo Asset Management Work Centers 7.6.0.3 Build
    20171121-0723 DB Build V7603-175
    Server OS Windows Server 2012 R2 6.3
    Server DB Oracle 11.2 (Oracle Database 11g Enterprise Edition
    Release 11.2.0.3.0 - 64bit Production With the Partitioning,
    OLAP, Data Mining and Real Application Testing options)
    (c) Copyright IBM Corp. 2017
    LOCAL FIX: N/A
    SECURITY IMPACT (Y/N): N
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * GA- Assign to Available Labor when the warning Work Zone     *
    * flag                                                         *
    * is ON Cause a Problem of Blank Dialog                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixpack  Release 7.6.1.0 of Base Services (Scheduler   *
    * 7671)or request an interim fix                               *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.0 of Base
    Services(Scheduler 7671)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ06468

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-05-16

  • Closed date

    2018-05-21

  • Last modified date

    2018-05-21

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
21 May 2018