IJ04387: THE TOOL AVAILABILITY IS NOT WORKING AT THE GRAPHICAL SCHEDULER LARGE PROJECT

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM: The Tool Availability is not working at the Graphical
    Scheduler Large Project
    Pre Conditions
    - Create some Work with Resources need including Tools that is
    available
    - Create a Schedule at the Graphical Scheduling Large Project
    that bring those work orders
    Steps to Reproduce
    1-) Go to the Graphical Scheduling - Large Projects
    2-) Move to the Graphical View
    3-) Expend the Resource
    PROBLEM: The Tool Availability is not showing at the Resource
    section
    EXPECT RESULT: As it works at the Graphical Scheduling that
    should work fine.
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Scheduling Large Projects application *
    * in Scheduler 7.6.7.                                          *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * TOOL AVAILABILITY IS NOT WORKING AT THE GRAPHICALSCHEDULER   *
    * LARGE PROJECT                                                *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ04387

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-02-23

  • Closed date

    2018-04-29

  • Last modified date

    2018-04-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
29 April 2018