IBM Support

IJ03670: GRAPHICAL ASSIGNMENT HOVER TEXT CHANGED FOR THE WORSE IN 7.6.0.9

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In Graphical Assignment (GA) hover text changed on the
    Assignment View tab from what it was in earlier versions.   And
    the procedure to customize it with a System Property no longer
    works so you cannot change it.   The hover text on the Work
    View tab did not change from earlier versions.
    
    Pre-7.6.0.9 the hover text showed the WO/task Description
    followed by the Craft name in parentheses such as:
    WO Description (CRAFT)
    
    In 7.6.0.9 there is only the Craft name in the hover text.
    
    Tested and reproduced on 7.6.0.9
    
    Steps to reproduce:
    1. Create a WO or 2 each having a duration and Planned Labor.
    2. Create a new Work List in GA.
    3. Add a Work Query to select the WO from step 1.
    4. Save
    5. Click on the Assignment View tab.    Adjust the screen so
    that the assignments can be seem.    Maybe by clicking on the
    Zoom to Fit button or the Zoom to Work button.
    6. Place the cursor on one of the Assignments  and wait a few
    seconds for the hover text to appear.
    
    This is the problem, it has only the Craftname, not the WO
    Description followed by the Craft in parentheses.
    

Local fix

  • (none)
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler users                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Tooltip for activity in GA was showing resource name         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fixed
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ03670

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-01-26

  • Closed date

    2018-01-29

  • Last modified date

    2018-01-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
29 January 2018