IBM Support

IJ03155: GRAPHICAL SCHEDULING - PROBLEM WHEN RUN OPTIMIZATION FOR CAPACITY PLANNING SCENARIO

Subscribe

You can track all active APARs for this component.

APAR status

  • Closed as program error.

Error description

  • PROBLEM:
    When the user try to make an optimization using the Capacity
    Planing scenario is is pushing all the record for the first day.
    PRE CONDITION
    - Setup the Calendar and Shift.
    - Make sure to have the Optimization Server up and running
    - Deploy the model at the Optimization Server
    STEPS TO REPRODUCE
    1-) Create some Work Orders (10) with Duration and Craft needs
    (4 hours, ELECT - for example)
    2-) Go to Graphical Scheduling application and setup a new
    record with Calendar and Shift
    3-) Add a query that bring the Work Orders to this Work List
    4-) Move to the More information tab and allow the Scenarios
    flag
    5-) Change the Status to Approved of the Work List
    6-) At the More Actions menu create a Capacity Planning scenario
    7-) After that Runt he Optimization put the target date as
    Today + 3 days.
    PROBLEM: After it run the results back and all Work Orders get
    to the First Day only
    EXPECT RESULT: It should prioritize on the 3 days available for
    planning.
    

Local fix

  • N/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo scheduler optimization users                          *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When the user try to make an optimization using the Capacity *
    * Planing scenario is is pushing all the record for the first  *
    * day.                                                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixpack  Release 7.6.1.0 of Base Services or request   *
    * an interim fix                                               *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.0 of Base
    Services
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ03155

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-01-10

  • Closed date

    2018-01-16

  • Last modified date

    2018-01-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP



Document information

More support for: Maximo Asset Management Scheduler

Software version: 767

Reference #: IJ03155

Modified date: 16 January 2018