A fix is available
APAR status
Closed as program error.
Error description
When a sundered domain occurs in a PowerHA v7 cluster with TieBreaker configured, there is a risk of the node(s) losing TieBreaker not rebooting when they should, if certain notifications to clients such as PowerHA's clstrmgr process are not handled as expected. The result will be both "sides" of the split will remain running, and a Domain Merge (GS_DOM_MERGE_ER) will occur later when connectivity between all nodes is restored, which will cause nodes to be rebooted at that time.
Local fix
Problem summary
While processing the TieBreaker action, if a client of Group Services (HAGS) is delayed in responding or has other issues, HAGS may not continue processing the necessary TB action on its part, resulting in the node not being stopped as expected.
Problem conclusion
The client logic in HAGS has been corrected so that necessary TB activity can be handled even if a client being warned of the action does not respond to the notification.
Temporary fix
Comments
APAR Information
APAR number
IJ17503
Reported component name
RSCT FOR AIX
Reported component ID
5765F07AP
Reported release
324
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Submitted date
2019-07-09
Closed date
2019-07-09
Last modified date
2021-04-30
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
U889479
Fix information
Fixed component name
RSCT FOR AIX
Fixed component ID
5765F07AP
Applicable component levels
R324 PSY U889479
UP21/04/30 I 1000
PTF to Fileset Mapping
U889479 rsct.basic.rte 3.2.4.3
U889479 rsct.basic.rte 3.2.4.3
U889479 rsct.basic.rte 3.2.4.3
[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG11O","label":"APARs - AIX 4.3 environment"},"Platform":[{"code":"PF053","label":"Power Systems"}],"Version":"324"}]
Document Information
Modified date:
01 May 2021