Reloading the function control vector

This task is only necessary if you determined the FCV is not currently loaded on the TKE workstation crypto adapter.

To reload the Function Control Vector:

  1. Open the Trusted Key Entry window pane of the Trusted Key Entry Console.
  2. From the Applications list, open the Cryptographic Node Management (CNM) Utility.
  3. The CNM utility will prompt for a profile. Select TKEADM or equivalent profile.
  4. From the main CCA Node Management Utility screen, select Crypto Node –> Authorization –> Load off the pull down menu.
  5. Find the file named fcv_4tke80.crt and highlight it.
  6. Press the open push button.
  7. When prompted, press yes to confirm you want to load the FCV.
  8. An "authorizations have been loaded" message window displays. Press OK to close this window.
    Note: If you are unable to load the FCV, contact your IBM® service representative.
  9. Exit and logoff the CNM utility.