Section 12. Disaster site rebuilding

Use this information to do disaster site rebuilding.

  • Floor plan of data center.
  • Determine current hardware needs and possible alternatives.
  • Data center square footage, power requirements and security requirements.
    • Square footage ____________
    • Power requirements ____________
    • Security requirements: locked area, preferably with combination lock on one door.
    • Floor-to-ceiling studding
    • Detectors for high temperature, water, smoke, fire and motion