Section 12. Disaster site rebuilding
Use this information to do disaster site rebuilding.
- Floor plan of data center.
- Determine current hardware needs and possible alternatives.
- Data center square footage, power requirements and security requirements.
- Square footage ____________
- Power requirements ____________
- Security requirements: locked area, preferably with combination lock on one door.
- Floor-to-ceiling studding
- Detectors for high temperature, water, smoke, fire and motion
- Raised floor