Display History using JS (DSPHSTJS)

The Display History using Job Scheduler (DSPHSTJS) command allows you to display or print job completion history based on specified completion status, date ranges and sequences. The Display History using Job Scheduler command takes you to the Display History display which shows the job information, last run information and completion status for jobs based on the parameters you have selected in the DSPHSTJS command.

Parameters

Keyword Description Choices Notes
JOB Job entry Element list Optional, Positional 1
Element 1: Job Generic name, name, *ALL
Element 2: Group Generic name, name, *ALL, *NONE
Element 3: Group sequence 1-99, *ALL, *NONE
STATUS Completion status Single values: *ALL
Other values (up to 7 repetitions): *NORMAL, *ABNORMAL, *ABNGRP, *SBMERROR, *PROCESS, *JOBQ, *CANCELLED, *RESET
Optional
PERIOD Time period for history output Element list Optional
Element 1: Start time and date Element list
Element 1: Beginning time Time, *AVAIL
Element 2: Beginning date Character value, *CURRENT, *BEGIN
Element 2: End time and date Element list
Element 1: Ending time Time, *AVAIL
Element 2: Ending date Character value, *CURRENT, *END
RMTLOCNAME Remote location name Name, *ALL, *LCL, *JOBCTL Optional
SEQOPT Sequence option *DATE, *JOB, *GROUP Optional
START Entries to display first *LAST, *FIRST Optional
OUTPUT Output *, *PRINT Optional

Job entry (JOB)

Specifies the name of the job or jobs that you want to display or print. You can specify a group and associated sequence numbers for the jobs whose history you want to display or print. You can sequence the display or report by job, by date or by group. When you press Enter, you are taken to the Display History panel where you can perform various actions on the selected job history information.

Element 1: Job

*ALL
You want to display or print IBM Advanced Job Scheduler for i history for all jobs that meet the criteria specified in the command.
generic-name
Specify the generic job. For example, specifying JOB* would cause all jobs whose names begin with JOB to be included.
name
Specify the name of the job that you want to display or print.

Element 2: Group

*ALL
You want to display or print IBM Advanced Job Scheduler for i history for all jobs that are members of any group.
*NONE
The job is not a member of a group.
generic-name
Specify the generic group. For example, specifying GROUP* would cause all groups whose names begin with GROUP to be included.
name
Specify the name of the group for which you want to display or print.

Element 3: Group sequence

*ALL
All sequence numbers should be included in the jobs that you want to display or print.
*NONE
The job does not have a sequence number.
1-99
Specify the sequence number of the job that you want to display or print.

Completion status (STATUS)

Specifies the completion status that you want to use when displaying or printing IBM Advanced Job Scheduler for i history information.

Single values

*ALL
Include all jobs in the Display History display regardless of completion status.

Other values (up to 7 repetitions)

*NORMAL
The job came to normal end of job completion.
*ABNORMAL
The job completed abnormally. The IBM Advanced Job Scheduler for i log can be used to determine why the job ended abnormally.
*ABNGRP
The group ended abnormally. This completion status applies to all jobs in the group that did not process because a previous job group did not run successfully.
*SBMERROR
The job did not run successfully because there was an error in the job submission. An example of a submission error would be a job submitted by a user who did not have the proper authority to submit the job.
*PROCESS
The job is currently in process on the system.
*JOBQ
The job is currently in the job queue waiting for processing.
*CANCELLED
The job was cancelled prior to its completion.
*RESET
The job was manually reset.

Time period for history output (PERIOD)

Specifies the period of time for which the history entries are selected for the display or report.

Element 1: Start time and date

Specifies the beginning time and date at or after which history entries are included. Any jobs started before the specified time and date are not included in the display or report.

Element 1: Beginning time

*AVAIL
Any time that is available for the beginning date is included.
time
Specify the beginning time for the specified beginning date that indicates which history entries are to be included.

The time is specified in 24-hour format and can be specified with or without a time separator:

  • Without a time separator, specify a string of 4 digits (hhmm) where hh=hours and mm=minutes. Hours and minutes must each be exactly 2 digits (using leading zeros if necessary).
  • With a time separator, specify a string of 5 digits where the time separator specified for your job is used to separate the hours, minutes, and seconds. If you enter this command from the command line, the string must be enclosed in apostrophes. If a time separator other than the separator specified for your job is used, this command will fail.

Element 2: Beginning date

*BEGIN
History entries from the beginning of the history entries are included.
*CURRENT
History entries with a current date run date and between the specified beginning and ending times (if specified) are included.
date
Specify the beginning date. The date must be specified in the job date format.
integer
Specify a number to represent the number of days before the current date that you want to use for the search. An example would be 10. If today's date were 3/12/09 (date format is mm/dd/yy), the Begin date for the IBM Advanced Job Scheduler for i history would be 3/2/09.

Element 2: End time and date

Specifies the ending time and date after which history entries are not included. Any job completion times after the specified time and date are not included in the history entries for the display or report.

Element 1: Ending time

*AVAIL
Any time that is available for the ending date is included.
time
Specify the ending time for the specified ending date that indicates which history entries are to be included.

Element 2: Ending date

*END
The history entries to the end of the history information are included in the display or report.
*CURRENT
History entries whose run date is on or before the current date are included in the display or report.
date
Specify the ending date. The date must be specified in the job date format.
integer
Specify a number to represent the number of days before the current date that you want to use for the search. An example would be 10. If today's date were 3/22/09 (date format is mm/dd/yy), the End date for the IBM Advanced Job Scheduler for i history would be 3/12/09.

Remote location name (RMTLOCNAME)

Specifies the remote location and network identification of the system that created the job history that you want to display or print.

*ALL
Selects all job history for all systems in the network.
*LCL
Selects all job history for the local system.
*JOBCTL
Selects all job history using *JOBCTL as the remote location name.
remote-location-name
Specify the name of the remote location associated with the system whose job history you want to display or print.
network-ID.remote-location-name
Specify the network identifier and the name of the remote location associated with the system. Specify these values using the format nnnnnnnn.cccccccc where nnnnnnnn is the network identifier and cccccccc is the remote location name.

Sequence option (SEQOPT)

Specifies how the Display History display is to be sequenced.

*DATE
Sequences the Display History display by date.
*JOB
Sequences the Display History display by job.
*GROUP
Sequences the Display History display by group.

Entries to display first (START)

Specifies whether the newest job history entries or the oldest job history entries are shown first. The display station user can roll the display up or down to see other job history entries if the job history entry is on another display screen.

*LAST
The last (newest) job history is shown on the bottom line of the display.
*FIRST
The first (oldest) job history is shown on the top line of the display.

Output (OUTPUT)

Specifies whether the output from the command is displayed at the requesting work station or printed with the job's spooled output.

*
The output is displayed (if requested by an interactive job) or printed with the job's spooled output (if requested by a batch job).
*PRINT
The output is printed with the job's spooled output.

Examples

Example 1: Displaying Job Scheduler History

DSPHSTJS   SEQOPT(*JOB)  OUTPUT(*PRINT)

This command prints the Job Scheduler History report for all jobs and all groups. The report is sequenced by job.