Installing PTFs and analyzing your system for object conversions (V5R4 to IBM i 7.1 upgrade)

Start of changeWhen or after you upgrade your system from V5R4 to IBM® i 7.1, conversions occur on program objects in libraries, Java™ programs in directories, spooled files, and integrated file system names in file systems that are not case-sensitive.End of change

To have adequate time to prepare your system for the upcoming conversions, allow extra time before the upgrade to download planning PTFs for object conversion, analyze your system, and take necessary proactive steps for a successful upgrade. Such steps might include recompiling existing programs or, if programs cannot be converted, acquiring a new version from your software provider. You also might need to plan for possible down times.
Note: If this type of preparation is normally done by a third party, contact your application provider for assistance.

The planning PTFs for object conversion that you download include information and tools to help you prepare for the upgrade. The release level from which you are upgrading determines the PTFs that you use. These PTFs include the Analyze Object Conversion (ANZOBJCVN) command, which is used to collect information about the following objects:

  • Programs, modules, service programs, and SQL packages in all specified user libraries. By running the command, you can determine if they can be converted for IBM i 7.1. You also will have an estimate of the time required for these conversions.
  • Java programs from all the specified user directories. An estimate of the time required for conversion is given.
  • The total number of spooled files on each auxiliary storage pool (ASP) and the time to perform this conversion either during or after the upgrade.
  • Objects with names that contain characters affected by new Unicode characters and casing rules in IBM i 7.1. These objects are in directories that exist in file systems that are not case sensitive; for example, “root” (/) and user-defined file systems with CASE(*MONO).
Start of changeTo begin the steps of preparing your systems for V5R4 to IBM i 7.1 object conversions, following these general directions. End of change
  1. Start of changeReview Information APAR II14482 for the commands and function included with the conversion PTFs. This information APAR is in the preventive service planning information about the Support for System i® Link outside information center Web page. Select the link for technical databases; then select the link for Authorized Problem Analysis Reports (APARs). End of change
  2. Follow the suggestions and directions in the IBM Redpaper publication IBM i Program Conversion: Getting Ready for IBM i V6R1 Link outside information center.
  3. Download the planning PTFs that are identified in the Redpaper publication.