Ensuring that all installation tasks are complete
Ensure that you have performed all the installation tasks that are needed for your Tivoli Workload Scheduler for z/OS service. That is, you should have:
- Followed the appropriate procedures for the Tivoli Workload Scheduler for z/OS subsystem that you are installing
- Installed the required JES and SMF exits, and verified that they are active
- Created a JCL procedure for the tracker
- Allocated required data sets
- Given the security access for the subsystem to access the data sets
- Specified the initialization statements in the parameter library (EQQPARM)
- Included the tracker in the same XCF group as the controller, if the tracker uses an XCF connection
- Defined a VTAM® LU name for the tracker and activated the VTAM resources, if the tracker uses an NCF connection.