Tivoli Workload Automation, Version 8.6
Planning
Overview
Hardware and software requirements
Hardware requirements
Software requirements and optional software
Controlling system
Controlled z/OS systems
Optional software
Related software
Software compatibility
Parts and their relationships
Tracker
Controller
Server
Graphical user interfaces
Data Store
Configurations
Controlling system
Controlled systems
Integration with Tivoli Workload Scheduler
Subtasks
Relationship between the Scheduler and z/OS
Using the Tivoli Workload Scheduler for z/OS Program Directory
Sample library
The installation process
Planning your configuration
Planning considerations
Trackers
Initialization statements
Communication
How to connect Tivoli Workload Scheduler for z/OS systems
Shared DASD
z/OS cross-system coupling facility
VTAM (network communication function)
TCP/IP
Workstation destination
Workload restart
JES considerations
Basic server configuration example
Basic configuration examples
DASD connected
VTAM connected
TCP/IP connected
XCF connected
Tracker and controller in a single address space
Basic data store configuration examples
SNA only connection
XCF only connection
TCP/IP only connection
Mixed SNA and XCF connection
Planning your installation
Installation considerations
Configuring for availability
Hot standby
Starting an event writer with an event reader function
Using a Hierarchical File System cluster
Checklist for installing Tivoli Workload Scheduler for z/OS
[
Top of Page
|
Previous Page
|
Next Page
|
Contents
]