Explanation
The system has accepted a request to start a system-managed
process.
In the message text:
- process
- One of the following:
- REBUILD
- Initiation of a system-managed rebuild has been requested.
- DUPLEXING REBUILD
- Initiation of a system-managed duplexing rebuild has been requested.
- strname
- The name of the structure.
- oldcfname
- The coupling facility in which the original instance of the structure
resides.
- physicalver1
- First half of the physical version number of the original instance
of the structure.
- physicalver2
- Second half of the physical version number of the original instance
of the structure.
- logicalver1
- First half of the logical structure version number.
- logicalver2
- Second half of the logical structure version number.
- reason
- One of the following:
- CONNECTOR-SPECIFIED REASON
- The user that initiated the process specified its own reason for
starting it.
- OPERATOR-INITIATED
- The request that caused the process to be started indicated that
the request was initiated by the operator.
- POLICY-INITIATED
- The request that caused the process to be started indicated that
the request was initiated by the system based on the contents of the
CFRM policy. Message IXC536I will contain additional information.
- connreason
- Connector-specified reason for starting the system-managed process.
Present only when START REASON is CONNECTOR-SPECIFIED REASON. Consult
the documentation for the application that initiated the process for
the meaning of this value.
- AUTO VERSION:
- A unique value identifying the system-managed process being started.
It can be used to correlate messages and XCF component trace records
associated with the current system-managed process.
- procid1
- First half of the auto version.
- procid2
- Second half of the auto version.
System action
The system-managed process begins.
Operator response
System programmer response
Source
Cross System Coupling Facility (SCXCF)
Module
Routing code
Descriptor code