z/OS MVS System Messages, Vol 3 (ASB-BPX)
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


ATR227D

z/OS MVS System Messages, Vol 3 (ASB-BPX)
SA38-0670-00

ATR227D
CANCEL DELAYED. REPLY WAIT, BACKOUT, OR COMMIT TO RESOLVE INDOUBT UR. URID=uridentifier

Explanation

An operator issued the CANCEL command for an application, but there is a sync-point operation in progress for an in-doubt UR (unit of recovery), and the program needed to resolve the in-doubt UR is no longer available. Before CANCEL command processing can continue, the in-doubt UR must be resolved.

In the message text:
uridentifier
UR identifier for the in-doubt UR

System action

The system delays CANCEL command processing until the UR is resolved. When the UR is resolved, the system processes the CANCEL command.

Operator response

Notify the system programmer.

System programmer response

Reply WAIT to cause RRS to wait for the distributed sync-point manager (DSRM) to resolve the in-doubt UR. If replying WAIT does not work, you can use the RRS panels to resolve the in-doubt UR. IBM® recommends that you do not use the FORCE command after you have replied WAIT.

If you do not want RRS to wait for the DSRM, reply either:
  • BACKOUT to cause RRS to complete the sync-point operation and back out the changes
  • COMMIT to complete the sync-point operation and commit the changes.

If you need more information about the UR identified in the message, you can use the RRS panels, both to find out more about the UR and to resolve the UR.

User response

None.

Module

ATRAMAPT

Source

Resource recovery services (RRS)

Routing Code

1,2

Descriptor Code

12

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014