Adding a message event to a BPD
Start building the sample integration by adding a message event to a business process definition (BPD).
Before you begin
To perform this task, you must be in the IBM® Process Designer desktop editor.
Procedure
- Open the Process Designer desktop editor.
- Open a process application in the Designer view.
- Create a simple BPD that contains two activities. (If you need detailed instructions, see Creating a business process definition (BPD) .)
- Drag an Intermediate Event component from the palette onto the BPD diagram so that it falls between the two activities.
- In the text box that displays over the event, type a name for the event. For this sample, you can type: Incoming Message Event.
- Click the Implementation tab in the properties. The default implementation for intermediate events that are included in the process flow is Message.
- If not already selected, click the drop-down list and choose Receiving from the available message types.
- Use the Sequence Flow tool to connect the BPD components as shown in the following example:
- Save your work.