Before upgrading
Before running the upgrade, perform the following tasks:
- Close all IBM Endpoint Manager consoles.
- Back up your IBM Endpoint Manager server and database.
- Back up your license.pvk and license.crt to a separate location on the Endpoint Manager server or to a USB key.
- With version 9.0.777.0 (9.0 Patch 2), the
IBM Endpoint Manager underlying protocol on Linux systems changed
from SSL to Kerberos. If you integrated with Active Directory, before
upgrading from version 9.0.586.0 (9.0) or 9.0.649.0 (9.0 Patch 1)
to version 9.0.777.0 (9.0 Patch 2), run the following steps to continue
the integration:
- Take notice note of the Active Directory-related configuration on IBM Endpoint Manager.
- Remove the Active Directory integration.
- Upgrade IBM Endpoint Manager to 9.0.777.0.
- On the Console, select Tools -> Add LDAP directory to add again the integration with Active Directory.
- Set again the Active Directory-related configuration on IBM Endpoint Manager.
- If your server is configured in a DSA environment, increase the replication interval to prevent the replication from failing repeatedly during the upgrade. For additional information, see Changing the replication interval on Linux systems.
- Upgrade the Endpoint Manager components
according to the following order:
- Servers and consoles (console and server must have the same version and must be upgraded at the same time.
- Relays
- Clients
- For DSA servers, upgrade first one DSA server to ensure the upgrade is successful and then the other DSA servers.
Note:
- For large deployments, the server upgrade might take several minutes.
- After an upgrade your deployment might be slow because the upgrade downtime can create a backlog of client reports, and it can take several hours for the IBM Endpoint Manager server to process this backlog after the upgrade has completed.