IBM Support

Schedule execution in Rational Performance Tester results in "Message- Fill in all Requested Entries" error

Technote (troubleshooting)


Attempts to execute a schedule in IBM Rational Performance Tester (RPT) results in the error "Message- Fill in all Requested Entries".




It could be that a single execution process for the Systems Application and Products in Data Processing (SAP) extension for RPT instance is reaching the specified number due to which the schedule execution is failing.


Windows Server with SAP Extension for RPT

Resolving the problem

Ensure that a new process is created each time the number of SAP test instances reaches a specified number.

  1. Open the schedule scripts in RPT
  2. Under Schedule Elements Details section ensure the option Enable long run mode is checked.

Document information

More support for: Rational Performance Tester
Extension for SAP

Software version:

Operating system(s): Windows

Reference #: 1643954

Modified date: 16 July 2013