IBM Support

Test Schedule execution in Rational Performance Tester results in SAP connection error

Technote (troubleshooting)


Problem(Abstract)

Attempts to execute a Test schedule in IBM Rational Performance Tester (RPT) results in SAP connection error.

Symptom

image:

Cause

The ramp stages for the test schedule is not set.

Environment

SAP version 7.2 on Windows Server 2008 R2 Standard (64-bit operating system)

Resolving the problem

Procedure:

  1. Launch Rational Performance Tester
  2. Open the Test schedule script
  3. Add a Ramp-up time in the schedule

Document information

More support for: Rational Performance Tester
Test Schedules

Software version: 8.3

Operating system(s): Windows

Reference #: 1623807

Modified date: 29 January 2013