Calculating Costs While Specifying Foreign Currency on a Purchase Requisition or a Purchase Order

Question & Answer


Question

Can I calculate the total base 2 cost when specifying a foreign currency on a purchase requisition or a purchase order?

Answer

Unfortunately, you cannot calculate the total base 2 cost when you specify a foreign currency on a purchase requisition or a purchase order. The two values that you can calculate are:

1. The total cost that is expressed in the foreign currency.

2. The total cost for the base that is expressed in the base currency of your company (Base 1).

[{"Product":{"code":"SSLKT6","label":"IBM Maximo Asset Management"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Component":"Currency Codes","Platform":[{"code":"PF002","label":"AIX"},{"code":"PF010","label":"HP-UX"},{"code":"PF016","label":"Linux"},{"code":"PF027","label":"Solaris"},{"code":"PF033","label":"Windows"}],"Version":"7.1;7.1.1;7.2;7.2.1;7.5;7.6","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
17 June 2018

UID

swg21607074