Skip to main content

ITNM IP 3.9 FP1(TIPCore-FP5) fails to install in cluster-pair TIP


Flash (Alert)


Abstract

ITNM 3.9 Fix Pack 1 fails to upgrade install in clustered-pair TIP configuration.

Content

For Tivoli Integrated Portal instances running in a load
balanced cluster, each node should be disjoined from the original cluster
and upgraded separately. Once all the nodes have been upgraded, a new
cluster can be created.

ITNM does not support the TIP HA functionality in terms of balancing or failover. If ITNM is installed on a TIP server that is part of a HA cluster, please be aware of the usual ITNM limitations as you design the deployment - each instance needs a fixed connection to the same NCIM database and ITNM core server.

Related information

Technote

Rate this page:

(0 users)Average rating

Copyright and trademark information

IBM, the IBM logo and ibm.com are trademarks of International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at www.ibm.com/legal/copytrade.shtml.

Rate this page:


(0 users)Average rating

Add comments

Document information

Tivoli Network Manager IP Edition

Discovery and RCA


Software version:
3.9


Operating system(s):
AIX, Linux, Solaris, Windows


Reference #:
1593174


Modified date:
2012-05-03

Translate my page

Content navigation